Modular industrial controller
P.13 architecture and 13 October engineering review.
Five module designs are documented. Fabrication release, application firmware and mixed-module qualification remain open.
ExploreChoose local industrial control, coordinated motion, a modular modal analyzer or connected-equipment software. Each has a distinct role; custom hardware-to-platform integration is a separate development scope.

Bring inputs, local decisions, actuator commands and feedback into one modular design.

A modular controller, dual-motor drives and power management for compact multi-axis machines.
A dedicated analyzer in development for impact tests on brackets, housings and machine structures. Plan from 8 to 32 IEPE inputs.
Design control sequences, review equipment state and keep a useful operating history. The bootctrl platform brings these tasks into one workflow, with integration planned for bootctrl hardware.
Selected records · integration scoped for each product
Architecture illustration. Connections between the platform and bootctrl hardware are planned and require testing. AI/ML work starts with reliable data and reviewed results.
Start from the evidence for each product. Together, we can define what the next test needs to establish.
P.13 architecture and 13 October engineering review.
Five module designs are documented. Fabrication release, application firmware and mixed-module qualification remain open.
ExploreMotion design basis and application boundaries.
Controller, dual-axis drive and power-board roles are defined. Ratings are targets; physical motion performance is not qualified.
ExploreMODAL prototype handoff and release gates, 13 October.
Direct-docked acquisition is documented. Calibration, USB performance, display and complete analysis software still need work.
ExploreMCR workflow and runtime documentation.
Control and telemetry workflows are documented. Integration with bootctrl hardware is planned; hardware testing and validation of learned models remain separate development work.
ExploreBring a machine sequence, a movement challenge, a structural test or an equipment-service question. Let’s define a useful first evaluation.